Construction planning and management questions with answers
138 multiple-choice questions. Open any question for its answer and explanation.
- The artificial activity which indicates that an activity following it, cannot be started unless the preceding activity is complete, is known as
- The independent float affects only
- PERT analysis is based on
- Pick up the correct statement from the following with regards to C.P.M. network analysis of projects
- A CPM family includes
- PERT technique of network analysis is mainly useful for
- In India, are prefabricated components costlier than those of traditional cast-in-situ items that the prefabricated components replace?
- What estimate would you give for the variance in above problem ?
- Mobilization advance up to 10% of the cost of work is given to a contractor
- Which of the following is not a PERT event?
- During the construction period, price variation clause in contracts caters to
- In PERT analysis, the time estimates of activities and probability of their occurrence follow
- At a work site, statistical quality control of concrete means
- Pick up the incorrect statement from the following
- Pick up the PERT event from the following
- Select the correct statement.
- Select the incorrect statement.
- Select the incorrect statement.
- Select the incorrect statement.
- Wheeled tractors are replacing crawler tractors because 1. Wheeled tractors travel faster. 2. Crawler tractors are more expensive. 3. Track parts of a crawler wear out quickly. 4. Crawler tractors have stick control. of following statements
- The maximum rimpull in the first gear of a tractor while towing a load is 6300 kg. The tractor weighs 12.5 tonnes and is operating along a 2 percent upgrade and the rolling resistance is 45 kg/tonne. Pull available for towing the load is
- The basic action involved in sheep foot rolling is
- If the expected time of completion of a project is 60 weeks with a standard deviation of 5 weeks, the probability of completing the project in 50 weeks and 65 weeks respectively will be
- The constraints in case of resource smoothening operation would be
- PERT is A. An analytic in concept B. Limited of event oriented diagrams C. Used for research and development projects D. All the above