  1. The artificial activity which indicates that an activity following it, cannot be started unless the preceding activity is complete, is known as
  2. The independent float affects only
  3. PERT analysis is based on
  4. Pick up the correct statement from the following with regards to C.P.M. network analysis of projects
  5. A CPM family includes
  6. PERT technique of network analysis is mainly useful for
  7. In India, are prefabricated components costlier than those of traditional cast-in-situ items that the prefabricated components replace?
  8. What estimate would you give for the variance in above problem ?
  9. Mobilization advance up to 10% of the cost of work is given to a contractor
  10. Which of the following is not a PERT event?
  11. During the construction period, price variation clause in contracts caters to
  12. In PERT analysis, the time estimates of activities and probability of their occurrence follow
  13. At a work site, statistical quality control of concrete means
  14. Pick up the incorrect statement from the following
  15. Pick up the PERT event from the following
  16. Select the correct statement.
  17. Select the incorrect statement.
  18. Select the incorrect statement.
  19. Select the incorrect statement.
  20. Wheeled tractors are replacing crawler tractors because 1. Wheeled tractors travel faster. 2. Crawler tractors are more expensive. 3. Track parts of a crawler wear out quickly. 4. Crawler tractors have stick control. of following statements
  21. The maximum rimpull in the first gear of a tractor while towing a load is 6300 kg. The tractor weighs 12.5 tonnes and is operating along a 2 percent upgrade and the rolling resistance is 45 kg/tonne. Pull available for towing the load is
  22. The basic action involved in sheep foot rolling is
  23. If the expected time of completion of a project is 60 weeks with a standard deviation of 5 weeks, the probability of completing the project in 50 weeks and 65 weeks respectively will be
  24. The constraints in case of resource smoothening operation would be
  25. PERT is A. An analytic in concept B. Limited of event oriented diagrams C. Used for research and development projects D. All the above