Construction planning and management questions with answers
138 multiple-choice questions. Open any question for its answer and explanation.
- The time by which activity completion time can be delayed without affecting the start of succeeding activities, is known as
- If the scheduled completion time of a project is more than the earliest expected time for completion of the project, then the probability of completion of the project within the scheduled completion time will be A. 50 % B. Less than 50 % C. More than 50 % D. 100 %
- The direct cost of a project with respect to normal time is
- Whenever an activity has zero total float, then
- While filling the tender for any work, the contractor considers
- Railway projects are treated as
- If the excavation of earth is done manually then it costs Rs. 10 per cum. A machine can excavate at a fixed cost of Rs. 4000 plus a variable cost of Rs. 2 per cum. The quantity of earth for which the cost of excavation by machine will be equal to the cost of manual excavation is
- Construction team means
- Assertion (A): Activity 57 is critical. Reason (R): Earliest finish time and latest finish time for events 57 are same
- The time which results in the least possible construction cost of an activity, is known as
- The area under the Beta distribution curve is divided into two equal parts by
- The grade resistance factor for an earth moving machine can be obtained by multiplying grade percentage by a factor approximately equal to
- Which one of the following is not an excavating and moving type of equipment?