System analysis and design
Guiding State PSC aspirants since 2016 50,000+ students · 1,000+ final selections Exam Calendar Results Call 9116926003
pscnotes
Pick your state

System analysis and design questions with answers

234 multiple-choice questions. Open any question for its answer and explanation.

  1. Which of the following decides which systems development projects to work on first ?
  2. The longest method of conversion is
  3. Where one has to process all the data records in a file, the best tile organization is
  4. An open rectangle
  5. The feasibilities studied in preliminary investigation is (are)
  6. Branch mark programs are best characterized as
  7. Conversion method in which users, being used to an old system, continue to use the old system, alongside the new system, is
  8. A programmer reviews the accuracy of an algorithm by _____ it.
  9. Sequential organization
  10. A _____ is software that is designed for drawing diagrams of information systems, writing process specifications, and maintaining data dictionaries.
  11. On the feasibility committee, department representatives serve as
  12. The systems conversion technique of totally removing the existing system and immediately implementing the new system is called a
  13. Which of the following statements is not true
  14. The data base be prepared until
  15. The system study project includes
  16. Which of the following is not a part of a Data Flow Diagram?
  17. The first step to the system study project is to
  18. The data stored on a tape or disk file may be recorded in a report form described as
  19. In Data structure, main characteristic of "ring" is
  20. Which of the following control structures is used in every program?
  21. A system design is said to be functionally modular if
  22. Difference between Decision - Tables and Decision Trees is (are)
  23. Structured design produces computer programs that are
  24. Decision tree uses
  25. The term scheme means