2 men and 7 boys can do a piece of work in 14 days, 3 men and 8 boys can do the same in 11 days. In how many days, 3 times the work can be completed by 8 men and 6 boys?

Asked in TNPSC Prelims 2015

  1. 21 days
  2. 18days
  3. 24 days
  4. 36 days
Show answer

Answer: A. 21 days

This previous-year question came without the commission's answer key; the answer was checked by AI. Always confirm with the official key.