During the solidification of casting, the total contraction of casting takes place in the following three stages. S1: the contraction of the liquid from the pouring temperature to the freezing temperature S2: the contraction associated with the change of phase from liquid to solid S3: the contraction of the solid casting from the freezing temperature to the room temperature. The correct methods of compensating contractions are __________________.
Asked in GPSC Gujarat Water Supply and Sewerage Board Engi. Service (Mechanical) 2025
Answer under review: our editors are checking this question. Try the other GPSC Prelims previous year questions questions meanwhile.
More GPSC Prelims previous year questions questions
- The permeability of sand mold increases initially by adding water due to ________________.
- A cube (side = 60 mm) and a sphere (diameter = 60 mm) were casted using copper. The solidification times of the cube would be ______ times of the solidification time of the sphere.
- The pattern allowances which is negative in nature is ______________.
- A rectangular block (500 mm × 400 mm × 300 mm) of steel with a central of 80 mm diameter is to be cast. If shrinkage allowance is 21 mm/m, then the hole diameter for a wood pattern will be ________.
- In the study of phase diagrams, the rule which helps to calculate the relative proportions of liquid and solid material present in the mixture at any given temperature is known as __________.
- The cold working of steel can be performed __________.
- The phenomenon that artificially increases the dielectric constant of plastics containing filler is known as ________________.
- A plate of 50 mm thickness needs to be reduced to 30 mm. The number of passes needed on a rolling mill having rolls of diameter 200 mm and having 0.1 as the friction coefficient between the roll surface and material is _________.