21 45 people take 18 days to dig a pond. If the pond would have to be dug in 15 days, then the number of people to be employed will be
Asked in HPSC HCS (Ex.Br.) & Other Allied Services Preliminary Exam- (CSAT) 2022
Show answer
Answer: B. 54
More HPSC Prelims previous year questions questions
- 22 A motorboat moves along a straight line path along a river bank from point A to point B. If the speed of the boat in still water is doubled, then the trip from A to B and back again would take 20% of the time that the motorboat usually takes for the journey. By how many times is the actual speed of the motorboat higher than the speed of the river flow?
- 23 Simple interest on a sum of ₹ 1230 for 2 years is ₹ 10 more than the simple interest on ₹ 1130 for the same period. What is the applicable rate of simple interest?
- 24 A river, 2 m deep and 45 m wide is flowing at the speed of 3 km per hour. The quantity of water that runs into the sea per minute is:
- 25 A stock of food is enough for 240 men for 48 days. How long will the same stock last for 160 men?
- 26 The greatest number among 2^60, 3^48, 4^36 and 5^24 is :
- 27 The average height of the basketball team A is 5 ft 11 inch and that of team B is 6 ft 2 inch. There are 20 players in team A and 18 players in team B. The overall average height is-
- 28 A two digit number is five times the sum of its digits. If 9 is added to the number, the digits interchange their positions. The sum of digits of the number is :
- 29 The product of Rajeev's age 5 years ago with his age 9 years hence( both in years) is 15. Rajeev's present age is: