A bridge that is constructed across a river has 3 spans. The clear distance between the two piers of the bridge is 20 meters. The width of each pier of the bridge is 5 meters. Estimate the length of the bridge.
Asked in GPSC Gujarat Engineering Service (Civil), Class-1 and Class-2 2025
Answer under review: our editors are checking this question. Try the other GPSC Prelims previous year questions questions meanwhile.
More GPSC Prelims previous year questions questions
- For a straight stream flow condition for bridge site, the value of design discharge is 650 m3 per second and the value of normal scour depth is 3.5 m. The value of constant for straight reach is 1.27. Estimate the maximum scour depth.
- The value of constant of variation is 50. The average cost of construction of one pier of the bridge is Rs. 45000. Estimate the economic span of the bridge.
- The value of maximum scour depth estimated using the Lacey’s formula is 9.0 m. The bridge site is at right-angled bend. The value of constant for maximum depth of scour at right-angled bend is 2.0. Assume Lacey’s silt factor for river bed as 1.0. Estimate the flood discharge under a bridge.
- A bridge is proposed to be constructed across an alluvial stream carrying a discharge of 1600 m3/sec. Estimate the surface width of the river according to Lacey’s regime theory.
- Which tunnel ventilation is provided when the length of the tunnel is large?
- Which of the following type of bridge does not fall under the classification of bridge according to type of superstructure?
- For an IRC class A and B loading, the impact factor for steel bridges having span more than 45 meters is taken as
- Which of the following force is not acting on the foundation of the bridge?