The vertical distance between the highest water level anticipated in the design and top of the retaining banks, provided to prevent overtopping of structures is
Asked in Kerala PSC Assistant Engineer - Soil Survey and Soil Conservation Dept 2025
Answer under review: our editors are checking this question. Try the other Kerala PSC Prelims previous year questions questions meanwhile.
More Kerala PSC Prelims previous year questions questions
- calculate head loss due to friction in a PVc pipe of size 4 inches and 100 m long, when water is flowing at a velocity 3 m sec–1, assume the value of coefficient of friction for PVc pipe as 0.005.
- Iso-efficiency lines of pumps are plotted on which curves of a Composite characteristic curve ?
- loss of priming after starting a pump may be due to
- Which of the following is the correct sequential arrangement of different components in the head control unit of a drip irrigation system ?
- The irrigation system consists of a pipe line rotating around a spindle point and supported by a large number of self-propelled towers is known as
- Expression to find out the area irrigated by an emitter in a drip irrigation system if the plant row spacing is L (m), emitter spacing is S (m), % of irrigated area is P and the number of emitters in each emission point is Ne is
- Ratio of volume of water drained to total volume of saturated soil in an unconfined aquifer is
- The low head, high discharge pumps commonly used for drainage and locally known as ‘Petti and para’ is a