For M/M/1 model the expected number of busy servers are equal to _______
Asked in GPSC Research Officer, Class-2 2026
Show answer
Answer: A. Traffic intensity ρ
This previous-year question came without the commission's answer key; the answer was checked by AI. Always confirm with the official key.
More GPSC Prelims previous year questions questions
- For M/M/1 system, the expected waiting time in the queue is
- For M/M/1 system, the expected queuing length is
- Minimize Z = 3X1 + 2X2. Subject to, 5X1 + X2 ≥ 10; X1 + X2 ≥ 6; X1 + 4X2 ≥ 12; X1, X2 ≥ 0. The optimum solution of the given problem is
- Which of the following statements is/are false? I: A non-degenerate basic feasible solution is the basic feasible solution which has exactly m positive Xi (i = 1, 2, ..., m), i.e., none of the basic variables is zero. II: A basic feasible solution is said to be degenerate if one or more basic variables are zero.
- The dual of the LPP: Max Z = 4x1 + 5x2 Subject to 3x1 + 2x2 ≤ 20, 4x1 – 3x2 ≥ 10, x1 + x2 = 5, x1, x2 ≥ 0 is
- Arrival of machinists at a tool crib are considered to be Poisson distributed at an average rate 6 per hour. The length of time the machinists must remain at the tool crib is exponentially with average time of 0.05 hours. Then the average number of machinists at the tool crib is
- In M/M/1 queuing model, the probability that the number of customers (units) waiting in the queue and the number of units being serviced is greater than k is
- The demand rate of a particular item is 12000 units per year. The set-up cost per run is Rs. 350 and the holding cost is Rs. 20 per unit per month. If no shortages are allowed and the replacement is instantaneous, then the minimum total expected annual cost is equal to