In which of the cases, Environmental Impact Assessment (EIA) clearance is required? (i) Building construction projects (≥ 15,000 m2) (ii) Township and area development projects (≥ 50 ha)
Asked in GPSC Engineering Aptitude 2024
Show answer
Answer: C. Both (i) and (ii)
This previous-year question came without the commission's answer key; the answer was checked by AI. Always confirm with the official key.
More GPSC Prelims previous year questions questions
- In Terms of Reference (ToR) for Environmental Impact Assessment of building construction and township and area development projects, which of the following is/are the theme(s) of assessing the impact on ‘Water Environment’? (i) Impact of water withdrawal on surface water (ii) Impact on ground water potential (iii) Wastewater generation
- According to India's Solid Waste Management (SWM) Rules, 2016, non-recyclable waste with a calorific value of ______ kcal/kg or higher should be used to generate energy through Waste to Energy (WTE) processes.
- What is the primary purpose of biomining in the closure of old dumps?
- Which of the following parameters are used to categorize the river stretches as critically polluted, severely polluted, moderately polluted, less polluted or good? (i) Biological Oxygen Demand (ii) Fecal Coliform (iii) Chemical Oxygen Demand (iv) Turbidity
- In a metallic bond, the free electrons that are responsible for electrical conductivity originate from
- The Hall-Petch relationship is used to describe the dependence of yield strength on
- For a reinforced concrete structure, subjected to freezing and thawing cycles, the most critical property of the aggregate is
- The fatigue strength of a material is most significantly affected by