In the AutoCAD drawing software, 'PLINE' command stands for
Asked in GPSC Graduate Engineer Trainee, Class-2, Gujarat Maritime Board (GMB) 2026
Answer under review: our editors are checking this question. Try the other GPSC Prelims previous year questions questions meanwhile.
More GPSC Prelims previous year questions questions
- Which of the following statements is/are correct? I. Route survey is a survey for determining the route, grades, etc., of a railroad, highway, or power line. II. Temporary benchmark is a fixed point with a known elevation used for level control during drainage construction works and surveys.
- Gantt Chart has ________ coordinates.
- Assignment of contracts by operation of law cannot take place in the case of
- For a stair, the sum of riser and tread, in centimetres, should be
- The angle of inclination of a stair with the floor is known as
- A moulding provided under the nosing to beautify the elevation of a step and to provide strength to nosing is called
- The damp-proof course I. May be horizontal or vertical II. Should be continuous III. Should be of good impervious material Choose the correct option:
- In scaffolding, the vertical members of the framework, supported on the ground is called as