A cross regulator is built

Asked in APPSC 15 27/2011 Deputy Surveyors Paper –II Click here to download/view pdf file

  1. below the head of an offtaking canal at a suitable downstream location
  2. in a main canal downstream of an offtake canal or escape
  3. at the up stream of an offtake canal
  4. along the axis of the head of the offtaking canal