The first hydroelectric power station in India was commissioned in 1897 at Sidrapong near Darjeeling, West Bengal. While the year mentioned in option A is 1887, which is incorrect (it should be 1897), Darjeeling is widely recognized as the location of the first such plant that marked the beginning of hydroelectric power generation in India. The other options are incorrect regarding the location and/or date of the first hydroelectric plant: Rawatbhata and Narora are known for nuclear power plants, and Kakrapara, while having power plants, was not the location of the first hydroelectric project in the 19th century. The year 1809 is far too early for electric power generation. Therefore, despite the typo in the year, option A correctly identifies the location associated with this historical development.
A small hydroelectric plant (130 kW) established near ____ ushered the hydroelectric power development in India.
Asked in MPSC CS Prelims 2016 · Topic: Industrial Sector (Industrial Infrastructure: Power, Logistics, and Special Economic Zones (SEZs))
More Economic Development questions
- Areas which are engines for economic growth supported by quality infrastructure and complemented by an attractive fiscal package are known as
- Which of the following is/are the component/components of the Integrated Power Development Scheme launched by the Government of India recently? 1. Strengthening of sub-transmission and distribution networks in the urban areas. 2. Metering of distribution transformers/ feeders/consumers in the rural areas.
- Which of the following are essential pre- requisites for establishment of a thermal power station ? 1. Availability of fossil fuels 2. Proximity to a river, lake or sea 3. Good transport network 4. Proximity to an urban centre Select the correct answer using the code given below :
- The main argument to establish 'Special Economic Zones' in India is :
- Recently, the Union Minister of Commerce and Industry launched National GIS-enabled Land Bank System. Which of the following statements are correct about the system ? 1. The platform is created to provide database of industrial clusters over South India. 2. The information available on the platform includes information about forest, drainage, raw material heat maps (agriculture, horticulture, mineral layers) and multiple layers of connectivity. 3. It will help India in achieving its target of 5 trillion USD economy in five years by providing transparent mechanism of land identification and procurement. Select the correct answer using the code given below :
- Which kind of power accounts for the largest share of power generation in India?
- The special Economic Zones Act was enacted in Feb. 2006. Identify which is not the objective of the SEZ?
- Consider the following statements related to Industrial Corridor Development Programme in India :