A solid obstruction put across the river to raise its water level and direct the water into the canal is
Asked in Mizoram PSC 12 Jr.Grade of MES (Civil) (Contract) under DM&RD 20151.General English2.General Studies3. Engineering Paper I4. Engineering Paper II5. Engineering Paper III
Show answer
Answer: A. Weir
This previous-year question came without the commission's answer key; the answer was checked by AI. Always confirm with the official key.
More MPSC Prelims previous year questions questions
- River training works in which the river is trained to provide sufficient depth for navigation during low stage of river is
- A process by which an alluvial river flowing allowing curves of bends abandons particular bank and establishing its main flow along a comparatively straight and shorter channel is
- Specific speed of pump is a type characteristic and can be used
- Pumps in parallel arrangement is used for
- Air vessels in single acting pump is to
- Hydraulic efficiency of hydraulic turbine is equal to
- In Pelton Wheel, jet ratio is
- Which of the following is impulse type of hydraulic turbine?