A temporary structure rendering lateral support for safety to unsafe structures for the time being is called
Asked in Meghalaya PSC Draftsman Grade-II Group-C 2025
Show answer
Answer: B. shoring
More MPSC Prelims previous year questions questions
- A horizontal platform between two successive flights of a stair is called
- The maximum percentage of water absorption of 1st class bricks in 24 hours is
- The initial setting time of ordinary Portland cement is
- The volume of 1 bag of cement of 50 kg is
- A temporary structure used as a mould for casting the members of a structure at site with fresh cement concrete is called a
- The process of finishing mortar joints in exposed brick or stone masonry is called
- Setting the plan of a building in a particular direction so as to get maximum benefits from the gifts of nature is called
- The lowest storey of a building either entirely or partly below the ground level is called