Choose the correct option which sequences the phases of project life cycle correctly.
Asked in TNPSC Evaluation and Applied Research (Subject Code 213)
Answer under review: our editors are checking this question. Try the other TNPSC Prelims previous year questions questions meanwhile.
More TNPSC Prelims previous year questions questions
- Which of the following does not have an impact on the project cost, benefit and life?
- Which is a form of triangulation which cannot be used in a study according to Denzin? (A) Data triangulation (B) Perspective triangulation (C) Sampling triangulation (D) Investigator triangulation (E) Answer not known
- __________ is a preliminary study conducted on a limited scale before the original studies are carried out. (A) Observation (B) Pilot study (C) Interview (D) Pretest (E) Answer not known
- __________ interviews involve the use of a set of predetermined questions and of highly standardized techniques of recording. (A) Personal interview (B) Structured interviews (C) In-depth interview (D) Telephonic interview (E) Answer not known
- Weight assigning and variable respecification are part of (A) Data cleaning (B) Data entry (C) Data adjusting (D) Data verification (E) Answer not known
- __________ sampling from a finite population refers to that method of sample selection which gives each possible sample combination an equal probability. (A) Snowball (B) Panel (C) Simple random (D) Judgement (E) Answer not known
- Which is the science of measurement of social phenomena regarded as a whole in all its manifestations? (A) Social work (B) Sociology (C) Statistics (D) Economics (E) Answer not known
- The different conditions under which experimental and control groups are put are usually referred to as (A) Analysis (B) Treatments (C) Exploration (D) Observations (E) Answer not known
All 17,707 TNPSC Prelims previous year questions questions →