This question requires knowledge of India's power generation sources and their installed capacity percentages as of a specific date (September 30, 2016). The Central Electricity Authority (CEA) and Ministry of Power are primary sources for this data. Hydro (Large Hydro): ~14.1% - Natural Gas: ing order by percentage is Hydro, Natural Gas, Nuclear, Diesel. This corresponds to the order of the numbers: 1, 2, 3, 4.
Consider the following sources of power generation: 1. Hydro 2. Natural gas 3. Nuclear 4. Diesel Arrange them in descending order of their percentage in the total installed capacity of power generation in India as on 30th September, 2016:
Asked in RO ARO pre 2016 · Topic: Industrial Sector (Industrial Infrastructure: Power, Logistics, and Special Economic Zones (SEZs))
More Economic Development questions
- In February 2020, which of the following place was in-principle approved as a site of a new major port?
- The Barauni - Guwahati natural gas pipeline project is (i) being developed by GAIL (ii) connects 12 districts of Bihar (iii) an extension of the Jagdishpur - Haldia - Bokaro - Dhamra Natural Gas pipeline (JHBPL) Which of the above statements is/are correct?
- The main source of energy for NTPC to produce electricity is
- Which two States have been jointly ranked first in the ease of doing business ranking issued by the World Bank and DIPP in October 2016?
- As per the policy applicable in 2017, how much Foreign Direct Investment (FDI) is permitted in the defence sector in India ?
- What does venture capital mean?
- A Non-Resident Indian wants to get approval under Government route for FDI in 'Single Brand' product retailing in India. Which among the following would be the appropriate agency to approach for this application ?
- Industrial credit is available from