It aims to generate 1,00,000 MW of power Jawaharlal Nehru National Solar Mission (JNNSM) was launched in 2010. The solar capacity target under the mission was revised to 100 GW by 2022. 100 GW is equal to 1,00,000 MW.
Consider the following statements: National Solar Mission was launched in 2010.
Asked in by 2021 2022. · MPSC CS Prelims 2021 · Topic: Non-Conventional Energy (Solar Energy: Technologies, applications, and challenges)
More Environment and Ecology questions
- The solar energy is a :
- Which is the international coalition of solar- resource rich countries that are collectively addressing common challenges on solar-energy applications?
- Choose the right matches among type : (1) Hydrogen - Alternative energy (2) Biogas - From Non-degradable waste (3) Solar energy - Water heating (4) Geothermal energy - Wind speed and direction
- Which of the following energy sources produces NO atmospheric pollution?
- The First Union Territory of India to run 100 percent on solar energy is
- With reference to technologies for solar power production, consider the following statements : 1. 'Photovoltaics' is a technology that generates electricity by direct conversion of light into electricity, while 'Solar Thermal' is a technology that utilizes the Sun's rays to generate heat which is further used in electricity generation process. 2. Photovoltaics generates Alternating Current (AC), while Solar Thermal generates Direct Current (DC). 3. India has manufacturing base for Solar Thermal technology, but not for Photovoltaics. Which of the statements given above is/are correct?
- With reference to solar water pumps, consider the following statements : 1. Solar power can be used for running surface pumps and not for submersible pumps. 2. Solar power can be used for running centrifugal pumps and not the ones with piston. Which of the statements given above is/are correct ?
- Which one of the following energy sources is the best in keeping environment clean?