Direct runoff is made up of
Asked in GPSC Deputy Soil Survey Officer, Class-II 2024
Show answer
Answer: A. Surface runoff, prompt interflow and channel precipitation
More GPSC Prelims previous year questions questions
- For a given shallow foundation of width 1.0m and average corrected SPT blows (N) is 25 and net foundation pressure equal to 50 kPa, the total settlement ‘S’ in mm is ?
- The design flood commonly adopted in India for barrages and minor dams is
- The most suitable method of irrigation for areas having low rainfall and strong winds is
- For the purpose of designing a well point system for lowering ground water table in sandy silt deposit for normal construction works, which Indian Standard is referred or recommended?
- The area, on which crops are grown in a particular season, is called
- Arrange the following items in descending order based on their heat of hydration.
- A flow net can be used to determine?
- The maximum rate at which a soil in a given condition is capable of absorbing water is called