Project crashing aims to reduce project duration by shortening critical activities. The economic benefit of crashing is maximized by selecting the critical activity with the lowest cost per unit of time reduction.
Economic saving of time results by crashing A) Cheapest critical activity B) Cheapest noncritical activity C) Costliest critical activity D) Costliest noncritical activity
Asked in ASSISTANT AUDIT OFFICER 2017 18 2017 · Topic: Planning (Planning Models and Strategies (e.g., Nehru-Mahalanobis Model))
More Economic Development questions
- The estimated time required to perform an activity, is known as A) Event B) Dummy C) Duration D) Float
- The first Five-Year Plan in India (1951-56) was based on which of the following models?
- Match list-I with list-II and select the correct answer using the code given below : List-I Five Year Plan A. First B. Second C. Third D. Fourth List-II Applied Growth Model 1. S. Chakravarty Model 2. Harrod-Domar Model 3. Ashok Rudra Model 4. Mahalanobis Model Code : A B C D (a) 1 3 2 4 (b) 2 4 1 3 (c) 3 1 2 4 (d) 2 1 4 3
- The concept of 'Natural Growth Rate' was given by
- Which of the following was the earliest regional planning exercise in India ?
- In which Five-Year plan, balanced regional development was emphasized as one of the major objectives of the planning excercise?
- Which state of India pioneered the idea of a state level techno-economic survey carried out in 1957-1958, with the technical help of Stanford Research Institute of California (U.S.A.) ?
- The formulation and success of a plan require the following : a. Planning Commission, Statistical data, Objectives b. Fixation of Targets and Priorities, Mobilisation of Resources c. Incorrupt and Efficient Administration, Proper Development Policy d. Economy in Administration, Education base