Generally, water supply projects are designed for a design period of
Asked in GPSC Provisional Key (Prelim) - 24/-23 Paper-2 2022
Answer under review: our editors are checking this question. Try the other GPSC Prelims previous year questions questions meanwhile.
More GPSC Prelims previous year questions questions
- The following is the effect of Nitrates impurities present in water
- In the Water Treatment Plant, following process is adopted to remove colloidal impurities
- Acceptable limit of Chlorides (as Cl) for drinking water as per IS 10500: 2012 is
- The following water distribution system is suitable for irregular developing town or city
- Which of the following is used for measuring the Turbidity of water in the field?
- The most common method of wastewater disposal is
- If the sewage contains greases and fatty oils, they are removed in
- For the design of sewers in India, the percentage of sewage discharge is assumed as