Hot startup of a boiler idle time period is ______ hours.
Asked in TNPSC TRADE - BOILER ATTENDANT (Subject Code 451)
Answer under review: our editors are checking this question. Try the other TNPSC Prelims previous year questions questions meanwhile.
More TNPSC Prelims previous year questions questions
- In Warming up a Boiler the temperature is increased
- After completion of test the pressure drop rate should not be more than ______ KSC/minute.
- Hydro test must be carried out ______ time the maximum working pressure.
- The device used to control the flow of air or gases is
- The chloride value of DM water is
- Proper sizing of steam pipe line helping in minimizing
- Boiler stays are used to
- The ratio of heat utilised to produce steam and the heat liberated in furnace is known as
All 17,884 TNPSC Prelims previous year questions questions →