If a CNC Program uses G93 with a feed rate F = 2 How long will the move take?
Asked in TNPSC TRADE ADVANCED COMPUTER NUMERICAL CONTROL MACHINING TECHNICIAN (Subject Code 534)
Show answer
Answer: B. 0.5 min
More TNPSC Prelims previous year questions questions
- Which command in G code is commonly used to move the A-axis
- When referencing the 4th axis the operator generally
- ______ is the primary function of the rotary table in 4th axis machining
- What advantage does a 4th axis CNC machine over a 3 axis machine
- In CNC rotary table, what component provide feedback for accurate positioning
- A machinist wants to drill 6 holes equally spaced around a circular flange what angle should the indexer be set to between holes
- In VMC machine indexer must be equipped with a ______ system
- How are the additional rotary axis labelled for an indexing application in CNC machines?
All 17,524 TNPSC Prelims previous year questions questions →