The correct answer is C. 20 J.

Work is done when a force is applied to an object and the object moves in the direction of the force. The amount of work done is equal to the force times the distance moved. In this case, the force is 50 N and the distance moved is 10 m. Therefore, the work done is 50 N $\times$ 10 m = 500 J.

Option A is incorrect because 0.2 J is the work done if the force is 2 N and the distance moved is 1 m.

Option B is incorrect because 5 J is the work done if the force is 5 N and the distance moved is 1 m.

Option D is incorrect because 500 J is the work done if the force is 50 N and the distance moved is 10 m.