If difference between costs linked to highest and lowest observation of cost driver is $36000 and observation of cost driver is 30 machine hours, then slope coefficient would be
Answer under review: our editors are checking this question. Try the other Costing questions meanwhile.
More Costing questions
- Cost of production is equal to . . . . . . . .
- In . . . . . . . ., two piece rates are set for each job.
- Match the items of List-I with List-II. List-I List-II a. Intangible assets 1. Ind AS 31 b. Impairment of assets 2. Ind AS 34 c. Interim financial reporting 3. Ind AS 36 d. Interests in joint ventures 4. Ind AS 38
- Which method of costing is best suited for interior decoration.
- Inventory turnover ratio is known as:
- From the following information, find out the number of units that must be sold by the firm to earn profit of Rs. 80,000 per year. Sales price: Rs. 25 per unit Variable manufacturing costs: Rs. 12 per unit Variable selling costs: Rs. 3 per unit Fixed factory overheads: Rs. 5,00,000 Fixed selling costs: Rs. 3,00,000
- If prime cost is Rs. 20,000; factory overheads are 25% of prime cost and office overheads are 80% of factory overheads then the office cost would be
- Flexible budget variance for revenues of company is classified as