If water table is encountered in the standard pit while conducting plate load test :-

Asked in RPSC 02Jun 2016Question Paper for Asst. Engineer (Civil) GWD Screening Test - 2014ASST. ENGINEER - 2014

  1. The pit is considered unsafe
  2. The load test should be abandoned
  3. The bearing capacity of soil cannot be determined in this condition
  4. Test should be conducted with complete dewatering continuously throughout the test duration

Answer under review: our editors are checking this question. Try the other RPSC Prelims previous year questions questions meanwhile.