In River training work for bridge up to a height of about 12 m, the embankment is constructed ______

Asked in GPSC Provisional Key (Prelim) - 24/-23 Paper-2 2022

  1. Parallel to the river banks
  2. Transverse to the river banks
  3. Inclined to the river banks
  4. None of the above