In surveying tacking short offsets can be used __________ Instrument.
Asked in TNPSC Trade Surveyor (Subject Code 387)
Answer under review: our editors are checking this question. Try the other TNPSC Prelims previous year questions questions meanwhile.
More TNPSC Prelims previous year questions questions
- If the distance is greater than a chain so __________ method adopted.
- Direct Ranging carried out in following which two method is correct?
- In chain survey horizontal distance measured in sloping distance using direct method another name is
- The limiting length of an offset does not depend upon
- Select the correct sentence is taking out offset.
- The frame limiting the drawing space, should be executed with continuous thin line of
- For pencil layouts and working drawings ______ colour papers are best suited.
- The role of a Surveyor is
All 17,884 TNPSC Prelims previous year questions questions →