In which of the following incentive plan of payment, wages on time basis are not guaranteed?
Asked in TNPSC FUNDAMENTALS OF FINANCIAL ACCOUNTING COST ACCOUNTING TAXATION AND OTHER LAWS (Subject Code 433)
Answer under review: our editors are checking this question. Try the other TNPSC Prelims previous year questions questions meanwhile.
More TNPSC Prelims previous year questions questions
- A Purchase Requisition is prepared by
- __________ is the evidence of the contract between the buyer and supplier for the supply / procurement of the materials
- Calculate the following from the details given (a) Re-order level (b) Minimum level (c) Maximum level (d) Average stock level Given : Normal usage = 50 per week Re-order quantity = 300 Maximum usage = 75 per week Minimum usage = 25 per week Re-order period = 4 to 6 weeks
- The shortage or excess found during physical verification shall be entered in
- Which of the following statements are True about "Weighted average price" method (i) Suitable when price fluctuate considerably (ii) This method maintains the issues prices as near to the market price as possible (iii) Price is calculated by dividing the total cost of material by the total quantity or materials in that stock (iv) Issue or price of materials represents actual cost of materials (A) (i), (ii) and (iii) are correct (B) (i) only in correct (C) (ii), (iii) only are correct (D) (i), (iii) and (iv) only are correct (E) Answer not known
- Match the following : Match correctly with their corresponding meaning. (a) Waste (b) Scrap (c) Spoilage 1. The materials are so damaged in the manufacturing process that they cannot be brought back to the normal specification. 2. Residue such as smoke, dust, gases etc. arises in the course of manufacturing process. 3. Low measurable utility, recoverable and be physically available. (A) 2 3 1 (B) 1 2 3 (C) 1 3 2 (D) 3 2 1 (E) Answer not known
- Match the following : Match correctly the formulae with their corresponding stock levels. (a) Re-order level (b) Minimum level (c) Maximum level (d) Danger level 1. Reording level + Re-order quantity – (minimum consumption × minimum Reorder quantity) 2. Maximum consumption × Maximum re-order period. 3. Re-ordering level – (Normal consumption × Normal Re-order period) 4. Average consumption × Maximum Re-order period for emergency purchases. (A) 2 3 1 4 (B) 3 4 1 2 (C) 2 4 1 3 (D) 1 4 3 2 (E) Answer not known
- Abnormal loss arising out of spoilage which is unexpected and uncontrollable is transferred to (A) Costing profit and Loss account (B) Charged to factory overhead (C) Not to be accounted (D) Debited to the job, product or process in which it occurs (E) Answer not known
All 17,524 TNPSC Prelims previous year questions questions →