Metallic tape are made of
Asked in Mizoram PSC 12 Jr.Grade of MES (Civil) (Contract) under DM&RD 20151.General English2.General Studies3. Engineering Paper I4. Engineering Paper II5. Engineering Paper III
Show answer
Answer: C. Cloth and wires
More MPSC Prelims previous year questions questions
- The first observation taken on a turning point in survey is
- The tacheometric method is more suitable method for preparing the contour map of a
- In a theodolite, the line passing through the intersection of the horizontal and vertical cross-hairs and the optical centre of the object glass and its continuation is known as
- The Global positioning system is recording data from
- Earthwork in plinth feeling in building is calculated by taking
- If the quantity of earth filling is 250 cum. Height of earth filling in plinth is 30cm and the height of sand filling is 15cm. Then, the quantity of sand filling in plinth is
- If the loose quantity of water bound macadam road is 600 cum, the compacted quantity approximately will be
- Travelling expenses for the sake of analysis of rates would be under the category