Tenders are invited in electrical works for the following reasons : (i) To select the lowest or most suitable bidder (ii) To follow Government procurement norms (iii) To check the earthing resistance of the installation (iv) To ensure fairness and transparency in awarding work (v) To determine the number of sub-circuits for a building From the above, the correct answer is
Asked in APPSC (Arunachal) Question Booklet (Set-A) of Paper I and Paper II 2026
Show answer
Answer: A. (i), (ii) and (iv) only
More APPSC Prelims previous year questions questions
- Reactive power sharing between parallel operation of three-phase alternators depends on
- For a resistive load, the input voltage to a single-phase half-wave controlled rectifier is 200sin100πt volt. For a firing angle of 60°, the average output voltage (in V) is
- Which colour is used to indicate earth connection?
- A 3-phase balanced star-connected load consumes P watts of power from a balanced 3-phase supply. If the same load is now connected in delta, the power consumption from the same supply will be
- The most commonly used material for overhead line insulators is
- A moving iron ammeter has a full-scale angle of 90° at a current of 1 A. If the ammeter has a square law response, then the current corresponding to a deflection of 45° is
- The permissible range of frequency as per IE rules is
- Which one of the following materials has a strong permanent magnetic moment?