The total capacity of the turbine generator working in the power station is
Asked in Mizoram PSC 12 Jr.Grade of MES (Civil) (Contract) under DM&RD 20151.General English2.General Studies3. Engineering Paper I4. Engineering Paper II5. Engineering Paper III
Show answer
Answer: C. Installed capacity