The total capacity of the turbine generator working in the power station is

Asked in Mizoram PSC 12 Jr.Grade of MES (Civil) (Contract) under DM&RD 20151.General English2.General Studies3. Engineering Paper I4. Engineering Paper II5. Engineering Paper III

  1. Dependable capacity
  2. Net capacity
  3. Installed capacity
  4. Available capacity
Show answer

Answer: C. Installed capacity