Total installed capacity of Nuclear Power Plants in India as of now (February 2025) is about ____%.
Asked in GPSC Gujarat Water Supply and Sewerage Board Engi. Service (Mechanical) 2025
Answer under review: our editors are checking this question. Try the other GPSC Prelims previous year questions questions meanwhile.
More GPSC Prelims previous year questions questions
- Which of the following “Triple Ts” is important to ensure proper combustion in a power boiler?
- In the flue gas analysis in a boiler, the composition of oxygen and nitrogen are estimated to be higher than the standard values. Which of the following measure will resolve the problem?
- Ultimate analysis of the coal used in a thermal power plant indicates percentage of Sulphur as 1% by mass and the specific coal consumption is 1kg/kWh. Assuming complete combustion, the amount of SO2 generated per unit of power generation from the power plant is_____ grams/kWh.
- Which of the following heat transfer equipment of a coal based power boiler of two pass type receives heat both by convection and radiation?
- Which of the following materials used in Gas turbine blades can withstand the highest temperature of operation?
- Problem of cavitation do not occur in _______ hydro turbine.
- Identify the odd one from the list given below based on its application.
- Which is the closest value of maximum solar heat flux received in India?