Under-reamed piles are generally
Asked in GPSC Provisional key (Prelim) - 40/2017-18 General Studies & Concerned Subject 2018
Show answer
Answer: B. bored piles
More GPSC Prelims previous year questions questions
- A Flow net cannot be utilized for the determination of which of the parameters
- To determine stability of earth dam slopes immediately after construction the pore pressures are generally estimated using
- Following statements are made on compacted soils, wherein DS stands for the soils compacted on dry side of optimum moisture content and WS stands for the soils compacted on wet side of optimum moisture content. Identify the incorrect statement.
- The standard Proctor compaction curve of a clay is depicted in the figure. Points A, B and C correspond to three compaction states of the soil, which fall on this curve. For which point(s) is the coefficient of permeability minimum?
- A plan drawn to a scale of 1:4000 was measured by a scale of 1:5000. The %error in the length measured will be:
- Basic principle of Surveying “working from whole to part” is:
- The type of survey in which the curvature of the earth’s surface is neglected, is called:
- The Mercator projection system used in atlases uses a