Which of the following components requires functional testing after installation? நிறுவப்பட்ட பிறகு செயல்திறன் சோதனை செய்ய வேண்டிய கூறு எது?
Asked in TNPSC Trade Wireman (SUB.CODE:550)
Answer under review: our editors are checking this question. Try the other TNPSC Prelims previous year questions questions meanwhile.
More TNPSC Prelims previous year questions questions
- What is the main purpose of a connector blocks in a control panel? கட்டுப்பாட்டு பேனலில் கனெக்டர் பிளாக்குகளின் முக்கிய நோக்கம் என்ன?
- What is the standard colour for the Protective Earth (PE) conductor in control panel wiring?
- Which of the following is NOT recommended during cable forming?
- In which type of circuit is a capacitor used to block DC and pass AC?
- Which protective device is commonly used to protect against over current?
- What is the standard width of a common DIN tail?
- Arrange the steps to wire an overload relay in a control panel. 1. Connect overload relay terminals in series with the motor. 2. Connect the relay coil to control circuit. 3. Select the current rating on the overload relay. 4. Connect normally closed contacts to the control circuit.
- How is the overload relay typically wired in the control circuit?
All 17,707 TNPSC Prelims previous year questions questions →