While estimating for plastering, usually no deduction is made for
Asked in APPSC (Arunachal) Question Booklet (Set-A) of Paper I and Paper II 2026
Show answer
Answer: D. All of the above
More APPSC Prelims previous year questions questions
- For 100 square metres of plastered surface, the quantity of lime required for one coat of white washing will be
- A document containing detailed description of all the items of work (but their quantities are not mentioned) together with their current rates is called
- If the camber is x%, then the cross slope is
- Ruling gradient is the ______ for vertical profile of a road.
- The extra-widening required for a two-lane national highway at a horizontal curve of 300 m radius, considering a wheel base of 8 m and a design speed of 100 kmph is
- The plan of a map was photocopied to a reduced size such that a line originally 100 mm, measures 90 mm. The original scale of the plan was 1 : 1000. The revised scale is
- The type of surveying in which the curvature of the earth is considered is called
- The plan of a survey plotted to a scale of 10 m to 1 cm is reduced in such a way that a line originally 10 cm long now measures 9 cm. The area of the reduced plan is measured as 81 cm². The actual area (m²) of the survey is