Which of the following statement(s) is/are correct with respect to the Nagpur Road Plan? (i) It classifies the roads of the country into 5 categories (ii) It assumes a star and grid pattern of road network (iii) It considers railway track length independent of the road system, focusing on connecting every town with a population of over 2,000 (and lower in hilly areas) with metalled roads
Asked in GPSC Gujarat Engineering Service (Civil), Class-1 and Class-2 2026
Answer under review: our editors are checking this question. Try the other GPSC Prelims previous year questions questions meanwhile.
More GPSC Prelims previous year questions questions
- Which of the following methods of road construction suggested that heavy foundation stones are not at all necessary to be placed at the bottom of the construction?
- For estimating the optimum road length by saturation system, which of the following factor(s) is/are considered for obtaining utility per unit length of road? (i) Population served by the road network (ii) Productivity (industrial and agricultural) served by the road network (iii) Number of Passenger Car Units/hour passing through the road network
- On roads with restricted width or on single lane roads, when two-way movement of traffic is permitted, the minimum stopping sight distance should be equal to ___________
- If the calculated superelevation works out to be less than the camber of the road surface, then the minimum superelevation required for effective drainage purpose is _________
- Which of the following statement(s) is/are correct regarding flexible pavement design methods? (i) McLeod method is based on empirical approach (ii) Burmister method is based on elastic two-layer theory (iii) Group Index method is a theoretical approach based on elasticity (iv) California Bearing Ratio method is purely theoretical
- The relationship between Modulus of subgrade reaction (K), pressure sustained (p) and displacement (∆) is expressed as ________
- Which of the following statement(s) is/are correct regarding selection of bridge site location? (i) Map study is used to identify the approximate location of the bridge site (ii) Reconnaissance survey is used for detailing the alignment and design (iii) Preliminary survey is used for rough identification of river bends (iv) Final location survey is used for the exact alignment and detailed design
- Which of the following statement(s) is/are incorrect regarding coefficient of friction? (i) It decreases for smooth pavement (ii) It decreases for wet pavement (iii) It decreases with increase in temperature (iv) It increases with increase in tyre pressure