Which of the following statement(s) is/are correct regarding selection of bridge site location? (i) Map study is used to identify the approximate location of the bridge site (ii) Reconnaissance survey is used for detailing the alignment and design (iii) Preliminary survey is used for rough identification of river bends (iv) Final location survey is used for the exact alignment and detailed design
Asked in GPSC Gujarat Engineering Service (Civil), Class-1 and Class-2 2026
Answer under review: our editors are checking this question. Try the other GPSC Prelims previous year questions questions meanwhile.
More GPSC Prelims previous year questions questions
- Which of the following statement(s) is/are incorrect regarding coefficient of friction? (i) It decreases for smooth pavement (ii) It decreases for wet pavement (iii) It decreases with increase in temperature (iv) It increases with increase in tyre pressure
- For estimating the total reaction time of the driver through PIEV theory, the time required for the driver to understand the situation is called as
- Consider ‘h/2’ is the height of the center of gravity of the vehicle above the road surface, ‘b’ is the width of the wheel base and ‘f’ is the transverse friction coefficient. To avoid the overturning and lateral skidding on the horizontal curve, the centrifugal ratio should be always ___________
- The required psychological widening for a horizontal curve of radius 225 m, width of pavement 7.5 m, longest wheelbase of the vehicle expected is 6.7 m and design speed is 60 kmph is
- If the length of transition curve is 60 m, radius of curve is 200 m and the design speed is 80 kmph, then the shift of transition curve is ___________
- The 24-hour traffic volume count at any station on a specific day in any month of the year is adjusted to Average Daily Traffic (ADT) as __________, where SF is Seasonal Factor, WF is Weekly Factor and DF is Daily Factor.
- The instantaneous speed of a vehicle at a specified cross-section or location is called as
- For the purpose of checking the requirement of highway geometric design elements, _________ is generally taken as the design speed of the existing roadway facility.