If the length of transition curve is 60 m, radius of curve is 200 m and the design speed is 80 kmph, then the shift of transition curve is ___________
Asked in GPSC Gujarat Engineering Service (Civil), Class-1 and Class-2 2026
Answer under review: our editors are checking this question. Try the other GPSC Prelims previous year questions questions meanwhile.
More GPSC Prelims previous year questions questions
- The 24-hour traffic volume count at any station on a specific day in any month of the year is adjusted to Average Daily Traffic (ADT) as __________, where SF is Seasonal Factor, WF is Weekly Factor and DF is Daily Factor.
- The instantaneous speed of a vehicle at a specified cross-section or location is called as
- For the purpose of checking the requirement of highway geometric design elements, _________ is generally taken as the design speed of the existing roadway facility.
- Which of the following statement(s) is/are incorrect regarding methods used for Origin–Destination (O–D) survey? (i) Floating car method (ii) License plate method (iii) Home interview method (iv) Tag-on-car method
- A subgrade soil sample is tested using standard CBR apparatus and the load values are observed as 60 kg for 2.5 mm penetration and 80 kg for 5 mm penetration. The CBR value of the sample in percentage is
- Temperature stresses can induce cracking in cement concrete pavements. If a slab undergoes uniform cooling, where is the crack most likely to develop in the slab?
- According to the position of bridge floor relative to the formation level and the highest flood discharge level, the bridges are classified as
- The Indian Roads Congress (IRC) code that is used for identifying or numbering the culverts and bridges is