According to the position of bridge floor relative...
Guiding State PSC aspirants since 2016 50,000+ students · 1,000+ final selections Exam Calendar Results Call 9116926003
pscnotes
Pick your state
GPSC Prelims previous year questions

According to the position of bridge floor relative to the formation level and the highest flood discharge level, the bridges are classified as

Asked in GPSC Gujarat Engineering Service (Civil), Class-1 and Class-2 2026

  1. Fixed-span or movable bridges
  2. Deck, through or semi-through bridges
  3. Simple, continuous or cantilever bridges
  4. Riveted, welded or pin-connected bridges

Answer under review: our editors are checking this question. Try the other GPSC Prelims previous year questions questions meanwhile.

More GPSC Prelims previous year questions questions

All 28,422 GPSC Prelims previous year questions questions →