Revised estimate is generally prepared when the original sanctioned estimate exceeds or likely to exceed by more than _________
Asked in GPSC Gujarat Engineering Service (Civil), Class-1 and Class-2 2026
Answer under review: our editors are checking this question. Try the other GPSC Prelims previous year questions questions meanwhile.
More GPSC Prelims previous year questions questions
- Equipment utilization factor is expressed as
- Depreciation of construction equipment because of new machine in the market which is more efficient than the existing one is called
- For calculating depreciation, which of the following methods assumes the loss of value of machine is directly proportional to its age?
- As per Rule 39 of the “Building and Other Construction Workers Central Rules, 1998”, every establishment employing __________ or more construction workers shall prepare a written statement of policy in respect of safety and health of construction workers.
- Which is the most suitable excavator to carry out excavation in water?
- The excess of minimum available time over activity time is called
- In a construction project using Earned Value Management (EVM) at a particular review date, the following data is available: • Planned Value (PV) = Rs. 40 lakh • Earned Value (EV) = Rs. 36 lakhs • Actual Cost (AC) = Rs. 48 lakhs Which of the following statements is correct?
- The optimistic, most likely and pessimistic time for an activity are 7 days, 15 days and 17 days respectively. The expected completion time (in days) of this activity is