For a bridge to be built across a tidal estuary, which of the following site conditions is most critical in determining the minimum vertical clearance of the bridge?
Asked in GPSC Gujarat Engineering Service (Civil), Class-1 and Class-2 2026
Answer under review: our editors are checking this question. Try the other GPSC Prelims previous year questions questions meanwhile.
More GPSC Prelims previous year questions questions
- _________ is most suited for compacting dry cohesionless granular material in road construction.
- IRC recommended camber for thin bituminous surface in a light rainfall area is
- The standard MKS unit of measurement for surface dressing and levelling, cleaning etc. is
- Revised estimate is generally prepared when the original sanctioned estimate exceeds or likely to exceed by more than _________
- Equipment utilization factor is expressed as
- Depreciation of construction equipment because of new machine in the market which is more efficient than the existing one is called
- For calculating depreciation, which of the following methods assumes the loss of value of machine is directly proportional to its age?
- As per Rule 39 of the “Building and Other Construction Workers Central Rules, 1998”, every establishment employing __________ or more construction workers shall prepare a written statement of policy in respect of safety and health of construction workers.