For a bridge to be built across a tidal estuary, which of the following site conditions is most critical in determining the minimum vertical clearance of the bridge?

Asked in GPSC Gujarat Engineering Service (Civil), Class-1 and Class-2 2026

  1. Highest astronomical tide (HAT) plus maximum wave height
  2. Mean sea level plus freeboard for vessel passage
  3. Design high flood level (HFL) plus navigation clearance requirement
  4. Maximum recorded storm surge level

Answer under review: our editors are checking this question. Try the other GPSC Prelims previous year questions questions meanwhile.