Consider the following statements regarding float in project management analysis: Statement I: Total float is the maximum time an activity can be delayed without delaying the overall project completion. Statement II: Free float is the amount of time, an activity can be manipulated without affecting the float of subsequent activities. Statement III: Free float is always greater than or equal to total float. Statement IV: Activities on the critical path have zero total float. Which of the above statements are correct?

Asked in GPSC Graduate Engineer Trainee, Class-2, Gujarat Maritime Board (GMB) 2026

  1. I and III only
  2. I, II and III only
  3. I, II and IV only
  4. I, II, III and IV
Show answer

Answer: C. I, II and IV only