A document containing detailed description of all the items of work along with their current rates is called
Asked in GPSC Gujarat Engineering Service (Civil), Class-1 and Class-2 2026
Answer under review: our editors are checking this question. Try the other GPSC Prelims previous year questions questions meanwhile.
More GPSC Prelims previous year questions questions
- In the detailed estimate, the areas are worked out to the nearest ________
- In the context of depreciation accounting for a road construction equipment, the term ‘scrap value’ is best defined as
- The plan of a building is in the form of a rectangle with center line dimensions of outer walls as 12.7 m × 15.7 m. If the thickness of the wall in superstructure is 0.30 m, then its plinth area (in m2) is
- A concrete batching plant was purchased 6 years ago for Rs. 50 lakhs. The company uses the straight-line depreciation method with an assumed useful life of 10 years and a scrap value of Rs. 5 lakhs. The current market value of the plant is Rs. 18 lakhs. Which of the following statements is correct?
- The type of estimate used for fixing up the value of the project for the insurance and tax schedule requirements is
- The architect, after consulting the client, invites a few contractors to submit tenders. This is called
- The success of the construction activities largely depends upon (i) Time and money (ii) Machinery and materials (iii) Skilled and unskilled manpower
- Which of the following statement(s) is/are true for ‘Dangling Error’? (i) A dangling error in a project network diagram (CPM/PERT) occurs when an activity is disconnected or hangs before the project's final event. (ii) Dangling error represents broken logic where an activity has no successor, making it appear to finish before the overall project is complete.