A retaining wall built parallel to the centre line of road is called

Asked in Mizoram PSC 12 Jr.Grade of MES (Civil) (Contract) under DM&RD 20151.General English2.General Studies3. Engineering Paper I4. Engineering Paper II5. Engineering Paper III

  1. Breast wall
  2. Revetment wall
  3. Return wall
  4. Toe wall
Show answer

Answer: A. Breast wall