A retaining wall built parallel to the centre line of road is called
Asked in Mizoram PSC 12 Jr.Grade of MES (Civil) (Contract) under DM&RD 20151.General English2.General Studies3. Engineering Paper I4. Engineering Paper II5. Engineering Paper III
Show answer
Answer: A. Breast wall
This previous-year question came without the commission's answer key; the answer was checked by AI. Always confirm with the official key.