On a bar chart the various activities of a project are shown by
Asked in Mizoram PSC 12 Jr.Grade of MES (Civil) (Contract) under DM&RD 20151.General English2.General Studies3. Engineering Paper I4. Engineering Paper II5. Engineering Paper III
Show answer
Answer: B. Horizontal lines
This previous-year question came without the commission's answer key; the answer was checked by AI. Always confirm with the official key.
More MPSC Prelims previous year questions questions
- CPM means
- An example for a parallel activity is
- If there will be numerous small jobs in different locations, the most suitable power shovel would be
- The size of bulldozer is indicated by
- In case of mass concrete work, most effective type of vibration would be
- The type of roller suitable for cohesive soil would be
- To prepare a job layout for a project, the general office and warehouse should be located
- The amount of time by which the start of the activity may be delayed without interfering with the start of any succeeding activity in CPM network is called