Calculate Bonus under Halsey plan Time allowed for a job is 48 hours a worker takes 40 hours to complete time. Time rate per hour is Rs. 15.
Asked in TNPSC FUNDAMENTALS OF FINANCIAL ACCOUNTING COST ACCOUNTING TAXATION AND OTHER LAWS (Subject Code 433)
Answer under review: our editors are checking this question. Try the other TNPSC Prelims previous year questions questions meanwhile.
More TNPSC Prelims previous year questions questions
- Employee cost includes
- Normal idle time includes (i) Small power failures (ii) Non-availability of raw materials (iii) Waiting for jobs, tools and materials or instructions
- In which of the following incentive plan of payment, wages on time basis are not guaranteed?
- A Purchase Requisition is prepared by
- __________ is the evidence of the contract between the buyer and supplier for the supply / procurement of the materials
- Calculate the following from the details given (a) Re-order level (b) Minimum level (c) Maximum level (d) Average stock level Given : Normal usage = 50 per week Re-order quantity = 300 Maximum usage = 75 per week Minimum usage = 25 per week Re-order period = 4 to 6 weeks
- The shortage or excess found during physical verification shall be entered in
- Which of the following statements are True about "Weighted average price" method (i) Suitable when price fluctuate considerably (ii) This method maintains the issues prices as near to the market price as possible (iii) Price is calculated by dividing the total cost of material by the total quantity or materials in that stock (iv) Issue or price of materials represents actual cost of materials (A) (i), (ii) and (iii) are correct (B) (i) only in correct (C) (ii), (iii) only are correct (D) (i), (iii) and (iv) only are correct (E) Answer not known
All 17,707 TNPSC Prelims previous year questions questions →