In a civil engineering work contract, the purpose of appointing an arbitrator is to
Asked in GPSC Provisional key (Prelim) - 40/2017-18 General Studies & Concerned Subject 2018
Show answer
Answer: B. avoid legal formalities, delays, and expenses
More GPSC Prelims previous year questions questions
- The main purpose of framing the conditions of contract is
- The amount which is paid at the time of submitting a tender is known as:
- Once a tender is accepted, a deposit of about 5% of the total estimated cost of the work is called:
- At the time of opening of the tenders invited for public works by a public body,
- Kinematic viscosity has the dimension as
- The resultant hydrostatic force on a submerged body acts through a point known as
- In steady flow
- In a venturimeter installed in a horizontal pipe the pressure is maximum at