In which of the following heat exchanger, Arithmetic Mean Temperature Difference (AMTD) is used instead of LMTD to find the heat transfer?
Asked in GPSC Gujarat Water Supply and Sewerage Board Engi. Service (Mechanical) 2025
Answer under review: our editors are checking this question. Try the other GPSC Prelims previous year questions questions meanwhile.
More GPSC Prelims previous year questions questions
- If the thickness of the plates is more than 30 mm, then which welding joint is preferable among the following?
- Which of the following component of a hydropower plant is likely to fail due to water hammer effect?
- Which of the following loss in a power boiler will increase due to the failure of brick lining?
- A coal based thermal power of large capacity needs to combust 200TPH of coal. It has five stage combustion with tangential firing system from four corners. Combustion capacity of each burner should be________ TPH. (TPH represents tonnes per hour)
- Flue gas temperature in the stack of the boiler is measured to be more than the design value. Possible reason for the problem is__________.
- Total installed capacity of Nuclear Power Plants in India as of now (February 2025) is about ____%.
- Which of the following “Triple Ts” is important to ensure proper combustion in a power boiler?
- In the flue gas analysis in a boiler, the composition of oxygen and nitrogen are estimated to be higher than the standard values. Which of the following measure will resolve the problem?