Quantities for wood work are computed generally in terms of
Asked in GPSC Soil Survey Officer, Class-I 2024
Show answer
Answer: D. Volume in cubic metres
More GPSC Prelims previous year questions questions
- Estimate for electrical wiring is prepared on basis of
- The information which cannot be included in drawing is conveyed to the estimator
- In the analysis of rates, the profit for contractor is taken as
- Tax generally not applicable to residential building is
- Damages caused due to delay in work are termed as ______
- If any extra items are to be executed as a result of change in design, rate for such items are derived from ______
- A notice inviting vendors to participate in pre-qualification process is formally called as ______
- Earnest Money Deposit (EMD) can not be submitted in ______ form